PROJECT NOTES

Selected case studies.

High-level summaries only. Confidential project, client and proprietary details are intentionally excluded.

BHOPAL & INDORE METRO

Design coordination across traction and station power

Technical review of RSS/TSS/ASS and third-rail systems, with emphasis on interfaces, vendor submissions, design compliance and commissioning readiness.

SURAT METRO

DC traction system engineering and approval

Review across 66 kV RSS, 33 kV ASS/TSS, traction transformers, rectifiers, DC switchgear, 750 V third rail, protection and SCADA integration.

KOLKATA METRO LINE 3

Protection, control and commissioning support

PMC review of protection schematics, interlocking, relay coordination and execution readiness for substations and 750 V DC traction systems.

BANGALORE METRO

Operations-focused traction power exposure

Substation, 750 V DC traction and SCADA-linked operating environment experience across depot and mainline systems.

SYSTEM INTEGRATION

From document review to energisation

Engineering emphasis on design closure, interface resolution, FAT/SAT evidence, test readiness and practical handover.

ENGINEERING APPROACH

Compliance plus constructability

Design decisions assessed against standards, physical interfaces, maintainability, operational risk and commissioning sequence.